Insulation and Sheetrock Party 10am-5pm Sunday 8-25-2013

5 posts / 0 new
Last post
ChuckMac
ChuckMac's picture
Offline
Last seen: 1 month 1 week ago
Alchemist, member since
Insulation and Sheetrock Party 10am-5pm Sunday 8-25-2013

We are in the home stretch with the ferm room! I need two bodies to install the insulation and the sheetrock tomorrow, Sunday the 25th!
No experience necessary! I will do all the cut outs for ya I just need your muscle to put it up!
We have 1 week to get the new space ready for the move on Saturday!
let's bang this shit out yo!

JamesLewis
JamesLewis's picture
Offline
Last seen: 1 year 10 months ago
How is the sheetrock coming?

How is the sheetrock coming?

kengetty
kengetty's picture
Offline
Last seen: 1 year 11 months ago
Alchemist, member since
Sheetrock was probably at 70%

Sheetrock was probably at 70% finished when Chuck and I called it quits last night around 12:30.  Chuck, Mark, Rich and myself finished the ceiling and most of the walls.  The air conditioner port was notched and the venting screwed in to the plywood.  Once Mark and Rich left, Chuck and I focused on getting the floor framed out.

We needed more supplies before moving forward, but I am sure Chuck is in there right now completing the rest of the sheetrock, securing the floor, insulating the floor, and cutting & installing the plywood floor as I type.

JamesLewis
JamesLewis's picture
Offline
Last seen: 1 year 10 months ago
Wow, great job guys. Thanks

Wow, great job guys. Thanks for pushing forward on this!

ChuckMac
ChuckMac's picture
Offline
Last seen: 1 month 1 week ago
Alchemist, member since
Sheetrock is installed floor

Sheetrock is installed floor is installed. Going to tape and mud this morn then paint party tonight!