Friday, August 9, 2013 - 7:30 PM to 9:00 PM

This meeting will be to assign and discuss the projects for the new brewhouse AT the new brewhouse. This is an all hands on deck meeting or everyone that is available. The following project leads have been assigned and will be planning their projects:

  • Concrete and Floor - Chuck
  • Electric - Lucas
  • Locks and Security - Lucas
  • Ferm Room Framing / Buildout - Evan
  • Storage - Jeff W
  • Gas and Water - Chuck
  • Floor plan - James
  • Propaganda - Steven
  • Scavenger - Adam
  • Barrels - Kyle

I can make it. Can we get some pizza or other food?

Also, is Chuck gas and water?

I changed it to gas and water for Chuck.

Oh... my... god.  Why haven't we done this?    http://thechive.com/2013/09/17/guys-rig-up-buddies-plumbing-with-beer-wh...

I don't think I'll get off work early enough to make it. I had previously mentioned the following in another post for Sundays meeting, but I don't think anyone saw it:

The idea of salvaging the wood making up the loft for use as shelving in the new spot

The Chiller Cart. In my previous post about keggles the issue of dealing with the chiller at the new location was brought up. A movable cart was mentioned. Iggy proposed the cart that is currently in front of the lockers. I believe this would make an excellent chiller cart, I think that the current chiller housing would fit perfectly on the bottom rack, perhaps with an extended high temp silicone inlet tube so we would no longer need to move kettles from the burner and carry hot wort. I had mentioned that we could include a bucket and an immersion chiller on this cart to act as a pre-chiller for the groundwater during hot weather. This would enable brewers to chill at a faster flow rate despite hot weather but would require 2 "Y" valves, a bucket or pot for it to sit in, and the brewer to bring a bag of ice to toss in the pre-chiller bucket if the weather conditions require it. Something like 2 of the items in the following link, one before the pre-chiller and one after, would enable the brewer to route the groundwater either directly to the CFC or to the pre-chiller.

http://www.grainger.com/Grainger/WESTWARD-Shut-Off-4KH07?Pid=search

I'll try and make an appearance because you guys so enthusiastically asked me for help on electric and yeast ranching. I'm excited to see the new digs and re-introduce myself for the second time. Cheers.

In the last meeting i mentioned that I would donate the framing of the ferm  room.  I'll be helping Evan with that portion of the project.  I am also going to be helping Lucas with electrical.

i think this is really a great post i like this. Social Media Marketing Manchester facebook marketing service.

 

Blog post like those are script install

 very nice keep posting good content like this.

i think this is a great post i like this is very nice. Web Design Manchester

Thank you for sharing that information. Hopefully you will post for more updates. Click here, breast actives before and after pictures

i think this is really a great post i like this.

I'll try and make an appearance because you guys so enthusiastically asked me for help on electric and yeast ranching. I'm excited to see the new digs and re-introduce myself for the second time. 

pay for homework